🤖

AI Models Active

6
Monitoring all equipment
⚠️

Predictions Made

12
In last 30 days

Accuracy Rate

94.8%
Model precision
💰

Cost Savings

$24,500
This month

Active Maintenance Predictions

HIGH RISK
Confidence: 92%

RO1 Membrane Degradation

Equipment: RO1 - Reverse Osmosis Unit 1
Predicted Failure: 7-10 days
Issue Type: Membrane performance degradation
Recommended Action: Schedule membrane replacement within 5 days
MEDIUM RISK
Confidence: 87%

UF2 Filter Clogging

Equipment: UF2 - Ultrafiltration Unit 2
Predicted Failure: 14-18 days
Issue Type: Filter clogging due to sediment buildup
Recommended Action: Perform backwash cycle and inspect filter
LOW RISK
Confidence: 78%

CL1 Chlorine Dosing Pump Wear

Equipment: CL1 - Chlorination Unit 1
Predicted Failure: 30-40 days
Issue Type: Dosing pump mechanical wear
Recommended Action: Monitor pump performance, plan replacement

Failure Probability Timeline

0% 20% 40% 60% 80% Today 10 Days 20 Days 30 Days RO1 Failure Risk: 78%

Equipment Health Score

UF1 98
Excellent
UF2 85
Good
RO1 72
Fair - Attention Needed
RO2 45
Poor - Maintenance Required
CL1 91
Excellent
CL2 95
Excellent

AI Insights & Recommendations

💡

Pattern Detection

Analysis shows RO1 pressure fluctuations correlate with temperature changes. Consider installing temperature compensation system.

📊

Efficiency Trend

UF2 efficiency decreased by 8% over the past month. Predicted to drop below optimal threshold in 14 days without intervention.

🔧

Maintenance Optimization

Combining RO1 membrane replacement with scheduled RO2 maintenance can reduce total downtime by 40%.

💰

Cost Savings

Proactive maintenance based on AI predictions has prevented 3 unexpected failures this month, saving $24,500 in emergency repairs.